European Oil, Gas, and Renewable Energy Solutions >  News  
 
> Homepage (News on Homepage)
> Upstream News
> Midstream News
> Downstream News
> Ocean Energy / Offshore Wind / Renewables
> General Interest News
> Equipment News 
>
Market Infos / Forecasts
> Events

 
  The LEWA giant - Chemical Injection Package for offshore application on a FPSO © LEWA 

See also:
»  EnergyPost  ... Independent, International, Incisive ... free weekly Newsletter and Website
»  Gas for Energy  ... Smart Gas Technologies, Infrastructure and Utilisation ... Magazine, Newsletter, and Website

 

 

LEWA's biggest Chemical Injection Package
for offshore application on a FPSO

 

Oct. 2015  + + +  LEWA has finished its biggest package up to today: The LEWA Chemical Injection Package for offshore application on a Brazilian floating production storage and offloading (FPSO) weighs 715 tons and measures 21.3 x 21 x 11 meters. In this ambitious project, our engineers faced major challenges. But in more than 7,500 hours of engineering, the LEWA giant was successfully realized. With this special solution, LEWA once again confirms its unique know-how as a leading global pump manufacturer and system integrator.

The LEWA giant
Chemical Injection Package for offshore application on a FPSO

Pump manufacturer and system integrator LEWA designed and produced the biggest chemical injection module in the company's history. The huge package is designed and manufactured by LEWA subsidiary in Singapore. The customer's requirements as well as the organizational and logistical effort for this project were very demanding.

For the ambitious and experienced LEWA experts, it was a big challenge, which they could cope with flying colors. 2015, the giant was completed: The Chemical Injection Package is used on a Brazilian FPSO. A FPSO is a colossal production ship for oil production, storage and loading.


The biggest Chemical Injection Package ever built by LEWA


( Picture left: Adolf Großmann, General Mgr Oil & Gas Solutions )

Over 40 diaphragm pumps, 120 chemical injection points, over 3,000 valves and instruments, 18 chemical storage tanks . . . LEWA's biggest Chemical Injection Package ever is a sophisticated record project realized by the highly skilled LEWA engineers. The German manufacturer of world-class pumps invested 7,500 engineering hours to realize the 715 ton weighing package. The Chemical Injection Package with its enormous dimensions of 21 x 21 x 11 meters was a showcase project in terms of engineering as well as project management and organization.

Source: LEWA - www.lewa.de

 

 






 


Worldwide more than
100,000 paid subscriptions

 

Since May 2015
Oil, Gas & Petrochem (OG&PE) is published as part of the
OIL & GAS JOURNAL to serve a consolidated monthly audience of 135,000 oil/gas professionals worldwide
» read more

 


Worldwide more than 48,000 subscriptions -
100% one-year direct request qualification

 


'What's New' in Upstream, Midstream and Downstream Products & Services. Circulation 37,000

 
PennWell
Petroleum Group:

Oil & Gas Journal
Oil & Gas Journal Russia
OGJ_eNewsletter
 
OGJ-Website-Statistics

Oil, Gas & Petrochem Equipment

Offshore Magazine
Offshore Russia
Offshore eNewsletter 
Offshore Website Statistics

Oil & Gas Financial Journal

+ + + 

 For more information, media kits or sample copies please contact
Andreas Sicking
+49 (0)2903-338570

wilhelms@pennwell.com www.sicking.de

Please send news releases to Wilhelm Sicking - sicking-media@email.de